Thursday, August 29, 2013
Walls
Yesterday the walls on the first floor were fabricated and raised. Here is a picture of the first one going up. Click on it for a better view. Today, some of the interior walls were added. The bottom picture is a panorama the day's work. The temperature was in the mid 90s today. It seemed 20 degrees hotter inside those walls.
Tuesday, August 27, 2013
Garage Foundation
Saturday, August 24, 2013
We Have Connections
On Friday the water and sewer to the new house were connected. Below are pictures of the connection to the water main. The man in the first picture is tapping into the water main in order to connect the line going to the house. He did not want me to take his picture, so naturally when he was not looking I took it. The reason for the double connection is that the only size valves the water company uses going into the main are 3/4 inch while the pipe going into the house is one inch. This guy says he does six or seven of these a day. Seems like purchasing one inch valves would save the water company a lot in labor costs.
The yellow pipe is the gas main.
The yellow pipe is the gas main.
On Being Square
This is a panoramic view of the carpenters finishing the first floor sub-flooring. They had all of the right tools and a division of labor that was as efficient as it was impressive. They really were a team. This deck is approximately 50' x 30'. They started from where this picture was taken and were finishing where you see them. At the end of the process, all of the edges of the 4' x 8' sheets of flooring were striking the exact middle of the 2" portion of the 2" x 12" floor joists, the same as when the process started and everything was square and level. Amazing!
Thursday, August 22, 2013
A Sticky Affair
A few weeks ago I mentioned to Chris that I did not want to have any squeaky floors or stairs in this house. He said not to worry, that all of the carpenters called him the "glue Nazi" . Here he is at work.
| Keeping the World Safe From Squeaks |
| Empty Glue Cartridges |
| This One Probably Will Not Be Squeaking |
Wednesday, August 21, 2013
The Carpenters Arrive :-)
Keeping the Basement Dry
Wet basements generate mold, so the ideal basement is a dry basement. To keep things dry, the outside basement walls are covered with a black "pitch" like substance and then a vinyl covering that looks kind of like bubble wrap is placed over the "pitch". The bubbles have small holes in them that captures any water that comes down the side of the basement and directs it down to the drain pipes and gravel that surround the foundation.
| The Forms Are Removed |
| Drain Pipe and Wall Covering are Installed |
| Gravel is Placed Over the Drain Pipe |
Friday, August 16, 2013
The Pour
On Tuesday, August 13, the walls for the basement were poured. It took about 9 yards of concrete, 8 trucks and all day to make it happen. Fortunately the weather cooperated and the high only got up into the 80s. It was still hot labor for the workers. The wet concrete is hot and the heat coming up out of the forms made the day seem much hotter for those guys.
| The Work Begins |
| Si (Duck Dynasty) the Cement Truck Driver |
| The Brain Trust |
| Careful!!! |
| Doing the Hard Work. |
| Soon To Be Entombed. |
| Straightening the Walls. |
| Waiting Their Turn. |
| The Leveler |
| Hot Work!!! |
| Finished, straightened wall |
Tuesday, August 13, 2013
Basement Walls Go UP
All Future Vacations Are Canceled ! ! !