Monday, July 22, 2013

Good Dirt

The geologist came to the construction site today and with an auger, bored a hole approximately three inches wide and three feet deep in each corner of the excavated basement.  He was able to visually determine that the soil had the proper integrity for building and no extraordinary reinforcing measures were necessary.

No comments:

Post a Comment