Tuesday, September 17, 2013

Gravel

The plumbers have finished installing the plumbing in the basement floor and tomorrow the concrete floor will be poured.  Getting ready for that, the crew who will do it spent the day putting a thick layer of gravel down as a base.  They built a chute and dropped the gravel from a front end loader, down the chute into to the basement and into wheelbarrows to be spread.
Gravel Going Down The Chute

Filling The Wheelbarrow

No comments:

Post a Comment